THE HINKLER, CARINGBAH WITH ECON GROUP

THE HINKLER, CARINGBAH WITH ECON GROUP

  • Demolition – 5 x Houses and associated structures
  • Asbestos removal
  • Shoring System – Capping beam – 125LM, Shoring Piles – No. 62, Anchors – No. 128 Shotcrete – 1160m2
  • Bulk Excavation – 19,870m3 (12m deep)
  • Detailed Excavation – 215m3